Hague Bar modular access steps
Four modular composite access steps delivered for a Network Rail landslip repair programme.

01
The requirement
The works required safe access from a retaining wall while supporting a time-sensitive landslip repair project.
02
The delivery
Following a site survey, four lightweight, corrosion-resistant and non-slip modular access steps were prepared for installation.
03
The operational benefit
The Network Rail team installed the steps without specialist contractors or heavy lifting, reducing disruption, installation time and labour demand.