MANUFACTURING & FABRICATION · UAE & GCC
Controlled fabrication for project-ready FRP assemblies
Composite components prepared as coordinated assemblies to reduce avoidable site work and protect project quality.

01
Fabrication follows the approved information
Cutting, drilling, assembly and identification should be controlled against the relevant drawings or schedules. Tolerances and site interfaces are considered before production release.
02
Modular where it creates value
Platforms, stairs, frames and access packages can be developed in transportable modules. The balance between workshop assembly and site assembly depends on logistics, lifting and access.
03
Prepared for delivery
Packaging, identification and installation information are planned around the agreed delivery method. Inspection points are defined in proportion to project risk and scope.
Discuss an FRP project with Vital Group.
Company-backed engineering, fabrication, supply, regional reach and local installation labour.